Saturday 7 January 2017









As the sixth wall went in, we began to get a sense of what it was going to look like. The 'shelf' on each of the last two walls (the fifth and sixth walls) needed adjusting to make them come into line. Otherwise, the walls were ready to accept the roof panels.



This was the tricky part; how to get each roof section placed correctly, attached and held in place while the next one is offered up and attached with screws. This took a lot of ingenuity, blood sweat and tears!